Weller Project
A 100' waterfront property w/ a 56' cliff. Property had an existing seawall approx. 6' tall which was severely damaged by Hurricane Isabel. We repaired the seawall and built a 12' ledge behind it with approx. 800 cubic yards of soil. We then placed filtercloth and 400 tons of #2 granite approx. 12' high. Afterwards we semi-graded the bank followed by seeding and cloth.
Hover Thumbnails Above for Larger Image
Copyright © 2015, Low Country Construction, LLC. All Rights Reserved Worldwide.
645 Phillips Road Walterboro, SC 29488 USA
Office: 843.538.4178 TAP-To-CALL Mobile: 843.908.4494
eMail Us At Info @ Lowcountryconstructionllc.com